China Top 3 Solar first 1MW solar farm mounting system for solar power plant
Well design Art Sign steel structure construction workshop for industry is a new type of building structure system.
The main steel frame is formed by linking up Q235 steel H section, Square post, steel Adjustable post, Steel round post,
midlle truss, side truss, post cap, truss cap and bearing. Also aluminum accessories like mid clamp, end clamp, ground
lug and stainless steel bolts.
Model: AS-SSFMS
Material: Hot Dipped Gal Q235, Aluminum 6005T5, Stainless Steel
Wind Load: Up to 60m/s Snow Load: Up to 1.5kn/m2
Characters:
*1 Posessses a wide span, with either a single or multiple spands and can have a maximum span clearance distance.
*2 Low cost price.
*3 Fast construction and easy installation.
*4 Has a long severice life of more than 50 years.
*5 The warehouses are also enviromentally friendly, and have a stable structure. The buildings are earthquack
resistance, water proof and energy saving.
*6 Widely application, the buildings are widely used as industry factory building.
Our Team -Products Processing -Packing&Shippment -Certificate -Design
ART SIGN Solar established in 2006. Specialize in designs and manufactures high quality solar mounting systems for
rooftop such as pitched roof, flat roof and ground open areas. Whether for small or large-scale projects, standard models
or tailor-made systems, we deliver what your need.
ART SIGN Solar is a leading manufacturer in solar industry. We provide design & manufacture & sales & service
customers support from our head quarters in Xiamen. We are working with companies from USA, Mexico, Austria,
UK, Brazil, Vietnam, Thailand, Australia, South Africa, Japan etc to provide best services.
In order to design the best mounting solution, pls provide below details.
1)solar panel datasheet( LxWxT)
2)planed layout: ___nos panels each pole
3)tile angle: ____degree
4)ground clearance___meters
5)orientation of solar panel: Portrait or landscape
6)foundation type___(concrete foundation, driving pile, ground screw)
7)wind load _____m/s and snow load______kn/m2